Project Portfolio
Our project reputation stretches beyond Southern African borders. With this project showcase, our capabilities to deliver all the piping requirements for your next project, are evident. Choose experienced, trusted manufacturers. Choose Hall Longmore.
Pilansberg North Water project
46km of 965 diameter steel-pipe.
Xtalene 3935 (Fusion Bonded Medium DensityPolyethylene (MDPE).
Coating with Cement Mortar Lining.
Komati Water Scheme Augmentation project
The Komati Water Scheme Augmentation Project (KWSAP) has been designed to resolve the water
supply problems to Eskom’s Duvha and Matla power stations in Mpumalanga. It augments the Komati Water Scheme from the Vaal Eastern Subsystem for the sole benefit of Eskom.
Spiral welded steel pipeline from the Rietfontein Weir to the Duvha Power Station
-
58.4 km water line
-
OD: 1100 mm
-
12,500 Tonnes
-
1,209 Tonnes of Bitumen
-
259,085 m2 Polymer modified Bitumen coating
-
20,400 m2 Lining Solvent Free Liquid Epoxy
-
No. of pipes manufactured: 3,208
-
No. of loads delivered to site: 797
Spiral welded steel pipeline from the Rietfontein Weir to the Matla Power Station
-
12.9 km water line
-
OD: 800 mm
-
1,500 Tonnes
-
200 Tonnes of Bitumen
-
41,200 m2 Polymer modified Bitumen coating
-
32,400 m2 Lining Solvent Free Liquid Epoxy
-
No. of pipes manufactured: 693
-
No. of loads delivered to site: 79
eThekwini Water and Sanitation (Western Aqueduct pipeline)
Pipe: Hall Longmore Spirally Welded Steel Pipe
-
Diameter: 600 NB – 1600 NB (nominal bore)
-
Pipe Length: 18 metres
-
Project Length: 70 km
-
Duration of manufacturing: 24 months
​​
Corrosion Protection
-
External Coating: Xtalene 3935,
-
Internal Lining: Solvent Free Epoxy
Richards Bay Coal Terminal
(Rubber Ring Jointed pipeline)
-
Approximately 3 km’s of steel pipe
-
Diameter: 300mm-900mm
-
Pipe Length: 18 metres
​
Features a protective internal cement mortar lining, a high-performance medium density polyethylene external coating - Xtalene 3935, and a patented jointing system which eliminates the need for conventional welding of pipe.
Gauteng Network pipeline
-
150 km diesel/fuel line
-
OD: 660 mm. API 5L X65
-
3LPE coating
-
150 km gas line
-
OD: 660 mm
-
24,299.73 Tonnes
-
414,711 m2 Canusa-Clad CPS Wrap Coating
-
No. of pipes manufactured: 8,378
-
No. of loads delivered to site: 1,027
Durban to Johannesburg Transnet New Multi Product pipeline (NMPP)
Pipe: Electric Resistance Welded (ERW) line pipe
-
Project Length: 720km
-
Diameter: 610 mm
-
Manufactured from Grade X65 steel of low sulphur content
-
Pipe Length: 18 metres
-
Coated with a high performance 3-layer
-
(Tri-laminate) external coating
​
Designed to transport petrol, diesel and jet fuel, the NMPP replaces the existing 350 mm diameter multi product pipeline manufactured by Hall Longmore in 1970.
More projects in Southern Africa
Click on each of the map pins to see the detail of each project.
International projects
Australia
Queensland Gas
35km gas line.
OD: 406mm/508mm.
API 5L X60. PSL 2. 3LPE coating.
Nigeria
Obajana Cement PLC
147km gas line.
OD: 423mm & 457mm.
API X52 & X65. 3LPE coating.
Tanzania
A G P Gas
84km gas line.
OD: 219mm & 273mm.
API 5L X52. 3LPE coating.
USA
Sasol: Lake Charles
11km of NB600, API 5L, ARO/F/